Steps to your kitchen renovation:

Steps to your kitchen renovation:

Firstly measurement, draft designing, choosing kitchen facilities, get quotations and timeline for the kitchen renovation (Normally signing of contract to delivery takes aprox. 4 weeks) You cannot use your kitchen for around 2 weeks. Works involved in this period are as follows:

1. Remove old kitchen (app.1 day)

2. Electricians and plumbers shut off the power and water, replace electrical and dated kitchen plumbing (replacement according to the design, generally 1-2 days)

3. Kitchen flooring (app.2-3days for tiles, timber floor takes app. 1 week)

4. Install kitchen cabinets and door panels (app. 1 day)

5. Bench top man comes to measure for the template, order kitchen bench top and install (Once the measurements are taken, you might have to wait from 5 days to 12 working days for the bench tops to be fabricated and installation only needs 1 day.)

6. Get back the electricians and plumbers to reconnect the power and water (1 day) *you can use kitchen at this point now*

7. Install the splashback: • Tile splash back can be done in 1 day. • Stone splash back can be done on same day with bench top. • For the glass splash back, you might have to wait from 7 days to 15 working days for the processing and painting and installation only needs 1 day.

Finally enjoy the fabulous meal and happy memories in the kitchen